Area by the water is coming along. Rocks are coming in including by slab for landing area
Month: September 2019
Waterfront Project Coming Along
Path to waterfront is coming along. The path for Lanee’s UV is built and the blocks of concrete in front of the dock have been removed. Next big step is to remove the concrete landings
Sunset at Sugarbush
It was a good day demolishing stuff. Stairs are out and Lanee’s utility vehicle path is built. It has created a nice view from the South side of the boat house. May create a path to the beach on the South side
Construction has Started
Will be redoing the walkway to the water with stone steps to replace wooden steps that are leaning. Also building a path to the water for Lanee’s utility vehicle. Also removing old stumps as part of the project
